Last night I finished the last four rivets on the inboard rib at the trailing edge, finished rolling the leading edges and blind riveted everything together.
Here you can see the pre-bent leading edges vs the completed leading edges. The trick here to get enough of a bend that the rivets aren’t strained holding the two halves together.
Here you can see another view of the leading edge before/after.
This view shows the rivets and the two mating surfaces of the leading edge.
I also put the berrings in and measured them to 13/16ths per the plans. Now on to the left elevator and trim tab