Today I spent about an hour prepping and sealing the fuel tank access plates. This was very messy and I didn’t get any pictures during the process. The fuel tank pick up lines and bulkhead fittings were glued and torqued. Also the anti rotation brackets were riveted and then sealed with tank sealant. Once those cute in a couple days I’ll be able to fully seal up the tanks.
I also spent some time on the remaining wing, I prepped the flap hinge loops by removing 3 loops from near the center of the flap. This will allow for easy installation of the flaps during final assembly.