More fuselage work

Today I spent some time working with the quick build fuselage. Because a lot of the work was done in the factory, there are parts in place that are held by temporary rivets. I went through and removed all of them and began disassembling the panels from the interior. 

Next I began with the control column and control stick installations. I’m kind of jumping the gun on this because it wil just have to come back out, but there’s something about giving the plane the control sticks that was kinda cool.

I also drilled all the seat rivets to #30 for the -4 rivets. 

I need to build a fuselage rack because right now it’s sitting on a furniture dolly and is too low. Before I work on the fuse any more I’ll build the frame to hold the fuse. 

More fuselage work

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s