Today I spent some time working with the quick build fuselage. Because a lot of the work was done in the factory, there are parts in place that are held by temporary rivets. I went through and removed all of them and began disassembling the panels from the interior.
Next I began with the control column and control stick installations. I’m kind of jumping the gun on this because it wil just have to come back out, but there’s something about giving the plane the control sticks that was kinda cool.
I also drilled all the seat rivets to #30 for the -4 rivets.
I need to build a fuselage rack because right now it’s sitting on a furniture dolly and is too low. Before I work on the fuse any more I’ll build the frame to hold the fuse.